Specification Details For ANTSPACE HD5
Product Overview | Value |
Model | ANTSPACE HD5 CE Version |
Dimensions (l*w*h), mm | 12192*2438*2896 |
Miner capacity | 308 units -S19 Hyd. & S21 Hyd. Series miner |
Container certification | CCS |
Safety certification | ANSI/ISO 12100:2012 IEC 60204 Ed 5.1 2009 |
Input Voltage and Frequency | 400V±5% 50Hz |
Detailed Characteristics | Value |
Shipping weight, T | 11 |
Operating weight, T | 17.2 |
Main switch of power distribution cabinets, A | 1200×4 |
Rated current, A | 700×4 |
Normal power, kW | 1512 |
Maximum power, kW | 1765 |
Rated current per Miner, A | 10 |
Inlet cable | The inlet copper cable has a voltage resistance of 600V or more, and each phase is required to below: L1 single core cable 400kcMil (185mm²)x8 L2 single core cable 400kcMil(185mm²)x8 L3 single core cable 400kcMil (185mm²)x8 N Single-core cable 400kcMil (185mm²)x4 PE single-core cable 400kcMil(185mm²)x4 |
Connection interface (Dry Cooling tower) | DN100(ISO2852 PN16) |
Connection interface (Plate heat exchange interface) | DN100(GB/T 9122-2010 PN16) |
Flow rate 1(1-1), m³/h | 67.2 |
Flow rate 2(1-2), m³/h | 73.9 |
Quantity of ANTSPACE powered by one 3750kVA Transformer | 2 |
Notes:
(1-1) Corresponding to 140 miners on one side, the main pump frequency of about 41 Hz.
(1-2) Corresponding to 154 miners on one side, the main pump frequency of about 45 Hz.
Specification Details For Dry Cooling Tower
Product Overview | Value |
Model | EC2-DT Dry Cooler(Container Type) |
Dimensions (L*W*H)(mm) | 12192*2438*2896 |
Detailed Characteristics | Value |
Shipping Weight, T | 12 |
Operating Weight, T | 13.5 |
Heat Dissipation Capacity | 1500kW |
Outlet water temperature @30˚C ambient temperature | 35℃±1˚C |
Container Certification | CCS |
Safety Certification | NFPA 79:2021 UL 508A:2018 R8.21 CSA C22.2 No. 14-18 IEC 60204 Ed 5.1 2009 |
Input Voltage and Frequency | 400V±5% 50/60Hz |
Operationg Power, kW | ≤80 |
Connection interface (Container) | DN100(ISO2852 PN16) |
Connection Interface (Drain Pipe) | DN20(Tapered tube) |
Noise @25℃, 15m | 75dBA |
Coolant Usage, m³ | 2.1 |
| Points For Attention
1 | Top dry tower and bottom system container stacked should be placed on a level ground., horizontal degree (±1℃). |
2 | The ground below said ANTSPACE units must be well-hardened and stable enough to always withstand the load of at least 32t. |
3 | Buyers of the ANTSPACE should prepare a 20t crane, assemble suitable tools and manpower, and arrange all required logistics if an ANTSPACE order is to be delivered to the site of operation. |
4 | Peripheral items such as stairs, transformers, cables, bridge racks and cable distribution boxes are not included with the ANTSPACE. hiveiris sales’ team would be happy to offer guidance regarding how to purchase these peripherals. |
5 | Confirmation of the container door opening direction is required. The switchboard side of the container is the default door opening direction. |
6 | Leave at least 4m of air inlet space of the both long side of the dry cooling tower. |
7 | Altitude: ≤ 2000m, greater than 1000m transformers and switches to consider capacity reduction, every 100m higher, about 1% capacity reduction. |
8 | Operating temperature: -25°C to 30°C. Operating humidity: 10%RH to 90%RH. The ambient temperature requirement in high humidity areas is not higher than 30 °C. When the ambient temperature is <0 °C, the inlet and outlet blinds should be closed and the internal heating should be >0 °C before the mining machine can be started. |
9 | The ambient temperature of the ANTSPACE does not represent the ambient temperature of the mining machine. |
| Purchasing Guidelines
1. The ANTSPACE HD5 is recommended to be used simultaneously with The ANTMINER S19 XP Hyd. / ANTMINER S21 XP Hyd.
2. The pictures shown are for reference only; the final shipment version shall prevail.
| Shipping Details
1. Shipments will be scheduled on a first-paid-first-ship basis for orders on which hiveiris has received full payment.
2. You are responsible for any customs delays or returned shipments due to a lack of proper documentation. It’s highly recommended to be aware of local customs clearance policies and prepare all customs documentation ahead of time to avoid delays or unexpected costs.
3. Click here to download Certificates of Conformity and find additional information on customs clearance for hiveiris products.
| Warranty
1. A 365-day warranty period is provided starting from the shipping date. hiveiris will cover shipping costs when shipping a replacement unit within the warranty period.
2. The warranty only applies to the original purchaser who purchased the machine directly from hiveiris . Once the miner is resold, warranty coverage becomes the responsibility of the re-seller.
3. If the user fails to use the product per the given instructions, specifications, and conditions provided or changes the function settings of the unit without hiveiris ‘s prior consent, hiveiris will not be liable for any damage arising therefrom.
4. Click here for a complete list of the Terms & Conditions that apply to all orders placed on https://hiveiris.com/