ANTSPACE HD5 CE Version

$119,888.00

Specifications 1Set 308 Rack Space
Price
119,888 $/Package
Payment Method
USDBTCETCUSDC(ERC20)USDT(ERC20/TRC20)
Category: Tag:

Description

| Specifications


Specification Details For ANTSPACE HD5

Product Overview Value
Model ANTSPACE HD5 CE Version
Dimensions (l*w*h), mm 12192*2438*2896
Miner capacity 308 units -S19 Hyd. & S21 Hyd. Series miner
Container certification CCS
Safety certification ANSI/ISO 12100:2012
IEC 60204 Ed 5.1 2009
Input Voltage and Frequency 400V±5% 50Hz
Detailed Characteristics Value
Shipping weight, T 11
Operating weight, T 17.2
Main switch of power distribution cabinets, A 1200×4
Rated current, A 700×4
Normal power, kW 1512
Maximum power, kW 1765
Rated current per Miner, A 10
Inlet cable The inlet copper cable has a voltage resistance of 600V or more, and each phase is required to below:
L1 single core cable 400kcMil (185mm²)x8
L2 single core cable 400kcMil(185mm²)x8
L3 single core cable 400kcMil (185mm²)x8
N Single-core cable 400kcMil (185mm²)x4
PE single-core cable 400kcMil(185mm²)x4
Connection interface (Dry Cooling tower) DN100(ISO2852 PN16)
Connection interface (Plate heat exchange interface) DN100(GB/T 9122-2010 PN16)
Flow rate 1(1-1)m³/h 67.2
Flow rate 2(1-2)m³/h 73.9
Quantity of ANTSPACE powered by one 3750kVA Transformer 2

Notes:

(1-1) Corresponding to 140 miners on one side, the main pump frequency of about 41 Hz.

(1-2) Corresponding to 154 miners on one side, the main pump frequency of about 45 Hz.

 

Specification Details For Dry Cooling Tower

Product Overview Value
Model EC2-DT Dry Cooler(Container Type)
Dimensions (L*W*H)(mm) 12192*2438*2896
Detailed Characteristics Value
Shipping Weight, T 12
Operating Weight, T 13.5
Heat Dissipation Capacity 1500kW
Outlet water temperature @30˚C ambient temperature 35℃±1˚C
Container Certification CCS
Safety Certification NFPA 79:2021
UL 508A:2018 R8.21
CSA C22.2 No. 14-18
IEC 60204 Ed 5.1 2009
Input Voltage and Frequency 400V±5% 50/60Hz
Operationg Power, kW ≤80
Connection interface (Container) DN100(ISO2852 PN16)
Connection Interface (Drain Pipe) DN20(Tapered tube)
Noise @25℃, 15m 75dBA
Coolant Usage,  2.1

| Points For Attention


 

1 Top dry tower  and bottom system container stacked should be placed on a level ground., horizontal degree (±1℃).
2 The ground below said ANTSPACE units must be well-hardened and stable enough to always withstand the load of at least 32t.
3 Buyers of the ANTSPACE should prepare a 20t crane, assemble suitable tools and manpower, and arrange all required logistics if an ANTSPACE order is to be delivered to the site of operation.
4 Peripheral items such as stairs, transformers, cables, bridge racks and cable distribution boxes are not included with the ANTSPACE. hiveiris sales’ team would be happy to offer guidance regarding how to purchase these peripherals.
5 Confirmation of the container door opening direction is required. The switchboard side of the container is the default door opening direction.
6 Leave at least 4m of air inlet space of the both long side of the dry cooling tower.
7 Altitude: ≤ 2000m, greater than 1000m transformers and switches to consider capacity reduction, every 100m higher, about 1% capacity reduction.
8 Operating temperature: -25°C to 30°C. Operating humidity: 10%RH to 90%RH. The ambient temperature requirement in high humidity areas is not higher than 30 °C. When the ambient temperature is <0 °C, the inlet and outlet blinds should be closed and the internal heating should be >0 °C before the mining machine can be started.
9 The ambient temperature of the ANTSPACE does not represent the ambient temperature of the mining machine.

| Purchasing Guidelines


1. The ANTSPACE HD5 is recommended to be used simultaneously with The ANTMINER S19 XP Hyd. / ANTMINER S21 XP Hyd.

2. The pictures shown are for reference only; the final shipment version shall prevail.

 

| Shipping Details


1. Shipments will be scheduled on a first-paid-first-ship basis for orders on which hiveiris has received full payment.

2. You are responsible for any customs delays or returned shipments due to a lack of proper documentation. It’s highly recommended to be aware of local customs clearance policies and prepare all customs documentation ahead of time to avoid delays or unexpected costs.

3. Click here to download Certificates of Conformity and find additional information on customs clearance for hiveiris products.

| Warranty


1. A 365-day warranty period is provided starting from the shipping date. hiveiris will cover shipping costs when shipping a replacement unit within the warranty period.

2. The warranty only applies to the original purchaser who purchased the machine directly from hiveiris . Once the miner is resold, warranty coverage becomes the responsibility of the re-seller.

3. If the user fails to use the product per the given instructions, specifications, and conditions provided or changes the function settings of the unit without hiveiris ‘s prior consent, hiveiris will not be liable for any damage arising therefrom.

4. Click here for a complete list of the Terms & Conditions that apply to all orders placed on https://hiveiris.com/

Subscribe to our NEWSLETTER

Disclaimer

"At Hive Digital and Iris AI Blockchain Mining, we are committed to maximizing returns, protecting client capital, and driving growth through innovation. Our expertise in cryptocurrency mining, AI-powered infrastructure, and strategic investment management ensures that your assets are managed with precision, transparency, and a focus on long-term success. We combine advanced technology, sustainable energy, and proven strategies to create value and deliver results for every client we serve."

© 2025 hiveiris.com. All rights reserved.

hiveiris.com Blockchain Mining, Smart Investments, AI Future

Hive Digital and Iris AI Blockchain Mining (“HiveIris”) provides cryptocurrency investment management, mining infrastructure, and AI-driven solutions. While we are committed to protecting client capital and delivering strong performance, all digital asset investments involve risk and market volatility. Clients should seek independent advice and conduct due diligence before making financial commitments.

Stay Connected

You have not selected any currencies to display