$69,600.00

Specifications 1Set 120KW 376U Rack Space
Price
69,600 $/Package
Payment Method
USDBTCETCUSDC(ERC20)USDT(ERC20/TRC20)
Category: Tag:

Description

| Specifications


Specification Details For DCTANK AW1

Product Overview Value
Model DCTANK AW1
Dimensions (l*w*h), mm 6058×2438×2896
Server capacity, U 376
Container certification CCS
Safety certification NFPA 79:2024
UL 508A:2018 R7.22
CSA C22.2 No. 301:23
ANSI/ISO 12100:2012
EN ISO 12100:2010
EN 60204-1:2018
Input Voltage and Frequency 400V±5% 50/60Hz
Total IT load, KW 120
Detailed Characteristics Value
Shipping weight, T 4.6
Main Switch of Power Distribution Cabinets(A) 250×2
Rated current, A ≤405
Number of server cabinets 8
Single cabinet capacity, U 47
Single cabinet power density, KW 15
Inlet cable The incoming cable requires two three-phase, five-wire cables, each with the following requirements:
L1 single core cable 350kcMil(185mm²)
L2 single core cable  350kcMil(185mm²)
L3 single core cable  350kcMil(185mm²)
N Single-core cable  250kcMil(127mm²)
PE single-core cable  250kcMil(127mm²)

 

Specification Details For Cooling Tower

Product Overview Value
Dimensions (l*w*h), mm 6058×2438×2896
PUE(Power usage effectiveness)@ 25℃ ambient temperature 1.11
Rated Cooling Capacity, kW 120
Container certification CCS
Motor Rated Voltage and Frequency AV 400V±5%; 50/60Hz

 

Detailed Characteristics Value
Shipping Weight, T 5.8
Operating Weight, T 7.8
Supply Air Temperature,  25
Return Air Temperature ,˚C 38
Water Consumption @ 25˚C, m3/h 0.2
Noise Level @ 25˚C, 15m, dBA 75
Operating Temperature ,˚C -40~+45
Operation Humidity, RH 5%~95%

| Points For Attention


 

1 The equipment must be placed on a level surface with horizontal alignment within ±1 degree.
2 The ground must be hardened and stable enough to support a minimum load of 14 tons.
3 A 10-ton crane is required to unload the DCTANK equipment and cooling towers.
4 The delivery of DCTANK does not include additional items such as stairs, transformers, cables,
5 At least 5 meters of air intake space around the machine.
6 Altitude: ≤ 3000 meters. If the altitude exceeds 1000 meters, transformers and switches should be derated.

| Purchasing Guidelines


The pictures shown are for reference only; the final shipment version shall prevail.

 

| Shipping Details


1. Shipments will be scheduled on a first-paid-first-ship basis for orders on which hiveiris has received full payment.

2. You are responsible for any customs delays or returned shipments resulting from inadequate documentation. It is highly recommended that you familiarize yourself with local customs clearance policies and prepare all necessary customs documentation in advance to avoid delays or unexpected costs.

3. Click here to download Certificates of Conformity and find additional information on customs clearance for hiveiris products.

| Warranty


1. A 365-day warranty period is provided starting from the shipping date. hiveiris will cover shipping costs when shipping a replacement unit within the warranty period.

2. The warranty only applies to the original purchaser who purchased the machine directly from hiveiris . Once the miner is resold, warranty coverage becomes the responsibility of the re-seller.

3. If the user fails to use the product per the given instructions, specifications, and conditions provided or changes the function settings of the unit without hiveiris ‘s prior consent, hiveiris will not be liable for any damage arising therefrom.

4. Click here for a complete list of the Terms & Conditions that apply to all orders placed on https://hiveiris.com/

Subscribe to our NEWSLETTER

Disclaimer

"At Hive Digital and Iris AI Blockchain Mining, we are committed to maximizing returns, protecting client capital, and driving growth through innovation. Our expertise in cryptocurrency mining, AI-powered infrastructure, and strategic investment management ensures that your assets are managed with precision, transparency, and a focus on long-term success. We combine advanced technology, sustainable energy, and proven strategies to create value and deliver results for every client we serve."

© 2025 hiveiris.com. All rights reserved.

hiveiris.com Blockchain Mining, Smart Investments, AI Future

Hive Digital and Iris AI Blockchain Mining (“HiveIris”) provides cryptocurrency investment management, mining infrastructure, and AI-driven solutions. While we are committed to protecting client capital and delivering strong performance, all digital asset investments involve risk and market volatility. Clients should seek independent advice and conduct due diligence before making financial commitments.

Stay Connected

You have not selected any currencies to display